Delivered & Erected.
Across Southern Corridors.
Case studies and verified site documentation of TTK Precast units deployed on NHAI expressways, state highways, industrial corridors, and critical railway junctions.

Erection Telemetry
Madurai Ring Road Viaduct Phase II — Rapid Night Girder Launch
Fabrication, heavy transport, and tandem hydraulic crane launching of high-performance bridge girders traversing one of South Tamil Nadu's heaviest freight junctions without disrupting day traffic.
30-meter precast I-girders manufactured at Kappalur automated plant yard and transported via specialized 16-axle hydraulic modular trailers under pilot vehicle coordination.
Recent Corridor & Industrial Deployments
Every unit manufactured under computerized batch control with individual coupon tensile records and laser dimensional verification.

Dindigul-Theni Highway (NH-744): Segmental Box Culverts
84 Units of 3.0m x 3.0m high-discharge segmental box culverts installed across 4 bypass stream crossings. Replaced conventional cast-in-place pour cycles that would have halted monsoon drainage for two months.

SIPCOT Gangaikondan: Heavy Duty Precast U-Drain System
Engineered industrial runoff channel with integrated interlocking female-male tongue joints and D400 heavy-axle load bearing ductile covers for continuous container traffic.

Virudhunagar Rail Overbridge: Crash Barriers & Fascia Walls
Rapid assembly of precast reinforced earth (RE) fascia panels with customized ashlar stone textures and RDSO-approved high-impact safety parapets adjacent to active rail corridors.

Tuticorin Port Corridor: Pavement Slabs & High-Load Stormwater Boxes
Installed 14,000 m² of heavy-duty precast jointed pavement slabs capable of handling 120-ton reach stacker axle loads alongside anti-sulphate marine stormwater distribution culverts.
Kappalur Central Yard Logistics Radius
Strategically centered on NH-744 / NH-44 intersection with an active fleet of 24 low-bed trailers, mobile hydraulic cranes, and GPS load-monitoring escorts serving projects within a 350-km radius within 6 hours.
“TTK Precast delivered 36 prestressed girders ahead of our crucial monsoon milestone. Their synchronized nighttime launching schedule saved our concession over 14 operating days of traffic diversion penalties. Their automated cube test logs gave our independent engineers absolute confidence.”