Built for accountability, not just concrete.
TTK Construction was started in Madurai in 1980 by Mr. T. Thanikodi. Today we build roads, highways, bridges, railway overbridges and water works for government agencies across South India.
"Our concern was established in 1980. Continuous hard work, sincerity and quality of service spurred our growth."
— From the TTK Construction company profileClass 1 PWD Registered
Qualified to bid on large government infrastructure projects, with no value ceiling.
Works With TTK Precast
Beams, girders and box culverts, cast in a factory-controlled yard next door.
Railway Overbridges & Subways
Overbridges and subways in place of level crossings, such as LC 17 on the Madurai–Bodi line.
₹505 Cr Turnover
Our turnover in 2025-26, up from ₹444.62 Cr the year before.
Six service lines, one delivery promise.
From national highways to water pipelines, our own plants and machines keep every job moving.

Roads & Highways
Four-laning, two-laning, widening and maintenance of national and state highways, with asphalt from our own hot-mix plants.

Bridges & Flyovers
Major bridges, flyovers and vehicular underpasses, including the Narikulam Tank bridge on NH-7.

Railway Overbridges & Subways
Overbridges and subways in place of level crossings, including the bow-string steel overbridge at LC 17, Madurai–Bodi.

Canals & Water Works
Irrigation canals, flood banks, water supply pipelines and sewage treatment plants for municipalities and town panchayats.

Ready-Mix, Asphalt & Hume Pipes
We make our own ready-mix concrete, hot-mix asphalt and Hume pipes from 100 mm to 1600 mm.

Industrial & Landscaping Works
Internal roads and site works for industrial parks, including the SIPCOT industrial park at Thoothukudi.
Tested at every stage. Documented at every pour.
Every pour and every batch is tested and logged — using our own lab equipment and machinery, not a hired third party.
In-House Material Testing Lab
Certified for on-site testing and batch verification- Concrete Strength Testing:Concrete samples are tested at 7, 14 and 28 days to confirm strength before we move forward.
- Soil Testing:Every site's soil is tested to confirm it can bear the load before construction begins.
- Asphalt & Bitumen Testing:Asphalt mix is checked for density and durability before it goes on the road.
- Structural Testing:Bridge decks and structural elements are checked on-site without any damage to the structure.
Directly Owned Heavy Fleet
Ready to mobilize anywhere in southern Tamil NaduOur major contracts.
Some of our largest road, bridge and highway contracts, with their value and status.
| Contract / Project Description | Client Agency | Location | Value (INR) | Status |
|---|---|---|---|---|
| Four-laning of NH-47, Kerala border to Kanyakumari (Km 43/000–96/714) | NHAI, PIU Nagercoil | Kanyakumari, TN | ₹1,041.30 Cr | Ongoing · 85% |
| Two-laning of Dindigul–Theni–Kumili with paved shoulders | NHAI, PIU Dindigul | Dindigul – Theni, TN | ₹317.20 Cr | Completed Oct 2022 |
| New road from Thoothukudi to Vanchimaniyachi Railway Junction, Phase I (15.04 km) | Highways Department (Projects), Madurai | Thoothukudi, TN | ₹172.21 Cr | Ongoing · 33% |
| Upgrading and maintenance of Kumbakonam–Mannargudi road (SH 66) | Chennai Kanyakumari Industrial Corridor Project | Kumbakonam – Mannargudi, TN | ₹148.36 Cr | Completed Apr 2024 |
| Widening of Musiri–Namakkal road (NH 381B) from two to four lanes | National Highways, Salem Circle | Musiri – Namakkal, TN | ₹86.76 Cr | Completed Apr 2024 |
| Internal roads in the Furniture Park, SIPCOT Industrial Park | SIPCOT | Thoothukudi, TN | ₹81.10 Cr | Completed Aug 2024 |
| Operation and maintenance of Thiruvananthapuram Bypass (NH-66) | NHAI, PIU Thiruvananthapuram | Kazhakkoottam – Mukkola, Kerala | ₹63.55 Cr | Ongoing |
| 6-lane VUP at the NH-44 / NH-944 junction, Kavalkinaru, and 4-lane VUP at Sattaur | NHAI, PIU Nagercoil | Kavalkinaru, TN | ₹61.86 Cr | Ongoing · 75% |
Delivered across South India.
A look at some of our major road, bridge and railway projects.
Kanyakumari · OngoingNH-47 Four-Laning, Kerala Border to Kanyakumari
Four-laning of 53.7 km of NH-47, with additional structures. It links Kerala and Tamil Nadu and is 85% complete.
Dindigul – Theni · Completed 2022Two-Laning of Dindigul–Theni–Kumili
Two-laning with paved shoulders on NH-45 (Extn.) and NH-220, completed in October 2022.
Kerala · OngoingThiruvananthapuram Bypass Maintenance (NH-66)
Operation and maintenance of a four-lane national highway bypass in Kerala, including overlay.
Madurai – Bodi · Completed 2026Railway Overbridge at LC 17, Vadapalanji–Usilampatti
A bow-string steel girder overbridge that replaces a level crossing on the Madurai–Bodi railway line.
Madurai – Kanyakumari · Completed 2019Narikulam Tank Major Bridge, NH-7
A high-level bridge and balance road across Narikulam Tank on the Madurai–Kanyakumari section of NH-7.
Want to see more of our projects?
View All ProjectsNot just a contractor. A generational partner.
Started by Mr. T. Thanikodi as a proprietorship, built on hard work, sincerity and quality of service.
Converted into a partnership firm. Mrs. T. Pavalakodi, Mr. T. Sivakumar and Mr. T. Rajavel Pandian joined as partners.
Growth in roads, highways, bridges, railway works and water pipeline works across Tamil Nadu and beyond.
Up from ₹444.62 Cr in 2024-25, with ₹680 Cr targeted for 2026-27.
Ready to discuss your infrastructure project?
Whether it's a government project, an EPC inquiry, or private industrial work, get in touch with our team directly.
Life On Our Sites
A look at our sites in action — from foundation work to final paving.




Build Tamil Nadu’s infrastructure with us.
We're always looking for graduate engineers, surveyors, lab technicians and equipment operators to join a team with over 40 years of experience.
Contact Us
Send Us a Message
We usually respond within a day.