Status: Under ConstructionContract No. NHAI/TDN-088/2024 | Class 1 PWD Audited
Ongoing National Highway Package

NH-44 Theni – Dindigul

Theni – Dindigul 4-Laning & Bypass Connecting Corridor

Four-laning of the Theni – Dindigul corridor with a connecting bypass, including minor bridges, vehicular underpasses and full drainage reconstruction.

Engineering Spec Sheet
payments
Contract Value
₹82.70 Cr
NHAI item-rate contract
timer
Timeline Performance
In Progress
Phase II currently underway
account_balance
Client Principal
NHAI Division TN
National Highways Authority of India
verified_user
Safety & QA Audit
0 LTI
Live-traffic corridor works
Phase II Widening
Phase II Widening
Four-lane carriageway under construction
1 / 5
Section 03 // Detailed Engineering Dossier

Scope of Work & Structural Compliance

Widening to MoRTH 5th Revision specification under live traffic, with staged traffic diversion and full reconstruction of cross-drainage.

01

Civil & Highway Alignment Engineering

  • arrow_right_altDeep Earthwork & Subgrade Stabilization: Bulk cut-and-fill across high-plasticity black cotton soils, stabilised with lime-slurry injection to achieve a resilient modulus CBR of 12%.
  • arrow_right_altPavement Composition: Granular sub-base, wet mix macadam, dense bituminous macadam with VG-40 bitumen, topped with a stone matrix asphalt wearing course.
  • arrow_right_altElevated / Grade-Separated Works:Post-tensioned PSC girders precast off-site and transported on hydraulic multi-axle trailers, erected with laser-guided alignment.
  • arrow_right_altDrainage & Hydraulics:Reinforced concrete longitudinal side drains and RCC box culverts designed for one-in-fifty-year flash storm hydrological profiles.
02

Underpass & Interchange Complex

Construction of major vehicular underpasses allowing uninterrupted local traffic flow without grade interruption.

Vertical Clearance
5.50 Meters
Over-dimension clearance
Retaining Walls
RE Wall Fascia
Polymer geogrid reinforced
Slipform Barriers
56.8 Linear KM
M35 concrete slipformed
Standards RegisterRev 2026
verified

Third-Party Independent Testing

Direct oversight and QA verification conducted by the Department of Civil Engineering, National Institute of Technology (NIT) Tiruchirappalli.

verified

Roads & Highways Code Compliance

Executed to the applicable Indian Roads Congress, MoRTH or RDSO specification for this class of work, with records available for departmental audit.

Concrete Compressive Strength Curve (M40 Grade)NABL Accredited
Day 7 — target 28.0 MPa29.6 MPa · 105.7%
Day 14 — target 36.0 MPa37.4 MPa · 103.9%
Day 28 — target 40.0 MPa43.1 MPa · 107.8%
Batch plant tested: 410 Samples to dateStandard deviation: ±1.7 MPa
Capital Plant Assets

Dedicated Machinery Fleet Mobilised

View full TTK equipment directoryarrow_forward
Asset: PAV-09Active

Vögele Super 1800-3

High-compaction tracked asphalt paver with AB 500 TV screed, capable of continuous 8.5 m paving widths with laser sensor grade control.

Paving rate
700 Tonnes / Hour
Asset: ROL-14Active

Hamm 311 Tandem Rollers

11-tonne heavy tandem vibratory compactors with integrated HCM asphalt compaction meters, used to guarantee 98% laboratory density.

Linear load
30.5 kg / cm Front
Asset: CRN-03Active

SANY 150T Crawler Crane

Heavy-duty lattice boom crawler crane mobilised for tandem lifting and millimetre-accurate placement of 72-tonne PSC bridge girders.

Lift capacity
150 Metric Tonnes
Asset: BPL-02Active

Schwing Stetter M1.25

Fully automated on-site concrete batching plant with aggregate moisture sensors, chilled water dispensing and computerised micro-dosing.

Batching rate
60 m³ / Hour
Construction Logistics

Execution Milestones & Phasing Velocity

Chronological phasing of the critical path operations for this contract.

Month 01

Traffic Management Plan & Diversion Setup

Approved diversion plan implemented with temporary barriers, signage and a round-the-clock traffic cell.

Month 08

Formation & Subgrade — Phase I Complete

Earthwork and subgrade completed along the first phase with density testing at every chainage.

Month 16

Minor Bridges & Cross-Drainage Reconstruction

Minor bridges widened and box culverts reconstructed to the new carriageway profile.

Month 24

Phase II Crust & Paving

GSB, WMM and bituminous courses progressing in echelon across the second phase.

Phase II

Underpass, Furniture & Handover

In Progress

Vehicular underpass, road furniture and signage to complete before final handover to NHAI.

format_quoteOfficial Client Endorsement

“Traffic has been maintained throughout the widening with no significant disruption reported, and quality records have been submitted on schedule for every stage completed so far.”

Er. A. Naveenkumar

Project Director, NHAI Division, Tamil Nadu

verifiedCompletion Certified
Cert No.NHAI/TDN/PC-II/2025
Signed & sealedIn progress
Corridor Geometry

Theni – Dindigul 4-Laning Alignment

map

Total corridor length: 31.20 KM

Theni Bypass Start to Dindigul Connector

Carriageway
Four-lane divided
Cross-Drainage
Minor bridges and box culverts
Traffic
Maintained under diversion
Tender Procurement & Joint Ventures

Executing a similar project?

Engage our estimation cell for technical pre-bid assessments, precast structural solutions and consortium tenders.