100% Owned, Not Rented

Heavy Fleet Power & Rigorous Quality Assurance.

298 machines and plants, backed by our own quality control lab, so quality is checked at every stage, from subgrade to surface.

Equipmentprecision_manufacturing
298
Machines & Plants
Concreteengineering
8
Ready-Mix Plants
Transportscience
70
Tippers
Asphaltchevron_forward
260 TPH
Hot-Mix Capacity
OUR EQUIPMENT

Our Heavy Equipment Fleet

Our machines and plants work on all our sites, so projects keep moving on our schedule.

Ready-mix concrete plant with transit mixer
CP-30 & M1 Plants
8 PLANTS
Concrete ProductionSchwing Stetter, Ajax

Ready-Mix Concrete Plants

Seven CP-30 plants and one M1 plant, with 35 transit mixers of 6 cum to carry concrete to site.

PLANTS7 + 1
MIXERS35 × 6 CUM
STATUSACTIVE
Hot-mix asphalt plant loading a tipper
APOLLO HOT-MIX
2 PLANTS
Asphalt ProductionApollo

Hot-Mix Plants

Two Apollo plants, ANP 2000 and ANP 1500, making the asphalt for our road works.

ANP 2000140 TPH
ANP 1500120 TPH
STATUSACTIVE
VSI crusher plant at Andipatti, Theni
VSI CRUSHERS
3 UNITS
AggregatesPuzzolona, Metso

VSI Crushers

Crushing plants that make aggregate for our own sites, like the crusher at Andipatti, Theni.

CAPACITY200 & 300 TPH
UNITS3
STATUSACTIVE
Paver laying bituminous concrete
PAVERS & ROLLERS
3 PAVERS · 15 ROLLERS
PavingVögele, Apollo, Hamm, Volvo

Pavers & Rollers

Three pavers of 9 m and 7 m width, with 15 soil compactors and tandem rollers of 8 tonnes.

PAVERS3
ROLLERS15 × 8 T
STATUSACTIVE
Excavator cutting a trench
EXCAVATORS & LOADERS
51 UNITS
EarthmovingCaterpillar, Kobelco, Tata Hitachi, JCB

Excavators & Loaders

27 excavators, 14 backhoe loaders and 6 wheel loaders for earthwork on every project.

EXCAVATORS27
BACKHOES14
WHEEL LOADERS6
Tippers feeding a paver during overlay work
TIPPERS & TANKERS
83 UNITS
TransportBharat Benz, Ashok Leyland, Tata

Tippers & Water Tankers

70 tippers of 10 and 12 cubic metres, with 9 water tankers of 12,000 litres.

TIPPERS70
WATER TANKERS9 × 12,000 L
STATUSACTIVE
local_shipping
Also in Our Fleet:
50 generators · 20 tractors · 15 hydras (12–20 T) · 3 self-loading mixers · 1 concrete pump · 2 boom placers · 2 bituminous sprayers · 4 graders
Ask For The Full List
OUR TEAM

The People Behind Every Project

A permanent team of 350+ professionals runs our projects — not contracted labor, which means consistent standards on every site.

signpost
Project Directors
Oversee highway execution, alignment and scheduling on-site.
24ENGINEERS
account_balance
Bridge & Structural Specialists
Handle girder launching, post-tensioning and pier construction.
18SPECIALISTS
biotech
Quality Control Technicians
Test materials and inspect every batch on-site.
32INSPECTORS
front_loader
Equipment Operators
Certified operators for cranes, excavators and pavers.
85OPERATORS
terrain
Surveyors
Handle GPS surveying, alignment and drone mapping.
15SURVEYORS
SAFETY

5,000,000+ Safe Man-Hours (Zero LTI)

Every shift starts with a safety briefing, and every site follows strict protective-equipment and fall-safety checks.

Safety Compliance100% Audited
0
Lost Time Incidents (2022-2025)
365
Days Active Site Medical Coverage
verified_userFull compliance with worker welfare and insurance regulations.
verified_userRegular third-party equipment certification and crane load testing.
verified_userOngoing in-house training for all heavy equipment operators.
QUALITY TESTING

Our In-House Testing Labs

Every project site has its own on-site lab for soil, asphalt and concrete testing — so results come back in hours, not weeks.

square
IS:516 & IS:1199

Concrete Compression & Slump

Concrete samples are tested at 7 and 28 days to confirm strength before we move forward.

Testing Capabilities:
  • True-flow slump cone test
  • Water absorption & porosity
  • Computerized stress curves
layers
IS:2720 STANDARDS

Soil Mechanics & Subgrade

Every site's soil is tested to confirm it can bear the load before construction begins.

Testing Capabilities:
  • Heavy Modified Proctor tests
  • Nuclear density gauge testing
  • Grain size sieve hydrometer
local_fire_department
MORTH SECTION 500

Bitumen & Asphalt QC

Asphalt mix is checked regularly to prevent rutting and extend the life of the road.

Testing Capabilities:
  • Marshall stability & flow rigs
  • Centrifuge binder extraction
  • Core cutter thickness audit
radar
IS:13311 (PARTS 1 & 2)

Non-Destructive Testing (NDT)

Bridge foundations and structural concrete are checked on-site without any damage to the structure.

Testing Capabilities:
  • Ultrasonic Pulse Velocity (UPV)
  • Digital Schmidt rebound hammer
  • Cross-hole sonic logging (CSL)
verified
Open to Client & Third-Party Inspection

All test results are logged and available for review by clients, government agencies or independent consultants.

ISO 9001:2015MORTH VTH EDITION
Central maintenance depot with excavators and pavers under scheduled overhaul
MAINTENANCE & LOGISTICS

Fast Deployment, Regular Maintenance

Our central workshop keeps every machine certified and ready to work. Mobile mechanic vans are available 24/7 for on-site repairs.

schedule

48-Hour Deployment

We can move excavators, pavers and batching plants anywhere across Madurai, Tiruchirappalli, Tirunelveli and Coimbatore within two business days.

car_repair

Regular Maintenance

Scheduled servicing and inspections keep our machines running through peak paving season.

inventory_2

Spares On Hand

We keep a stock of critical parts on hand, so a breakdown doesn't stall a project.

GET IN TOUCH

Need Equipment or Site Testing for Your Project?

Get in touch for equipment availability, certifications, or lab testing details for your project.