arrow_backBACK TO ALL PROJECTS
Status: Completed March 2026Contract No. National Highways, Madurai · NH-49 Extn. (EPC) | Class 1 PWD Audited
Railway Overbridge

NH-49 Extn. (NH-85) · Vadapalanji to Usilampatti

Railway Overbridge in Lieu of LC 17, Vadapalanji–Usilampatti

A road overbridge at Km 22/2 of NH-49 Extn. (new NH-85, Madurai–Cochin road) that replaces level crossing LC 17 between Vadapalanji and Usilampatti railway stations, under the Sethubharatham project. The main span is a bow-string steel girder, 2 spans of 51.40 m.

Engineering Spec Sheet
payments
Contract Value
₹45.70 Cr
EPC contract, Sethubharatham project
event_available
Status
Completed
March 2026
account_balance
Client
National Highways
Divisional Engineer, Madurai
straighten
Main Span
2 × 51.40 m
Bow-string steel girder
Bow-String Steel Girder ROB
Bow-String Steel Girder ROB
Aerial view of the overbridge at LC 17
1 / 5
Section 03 // Detailed Engineering Dossier

Scope of Work & Structural Compliance

A road overbridge that removes a level crossing on the Madurai–Bodi railway line, so road and rail traffic no longer have to stop for each other.

01

Overbridge Works

  • arrow_right_altLocation: Km 22/2 of NH-49 Extn. (new NH-85, Madurai–Cochin road), in lieu of LC 17.
  • arrow_right_altRailway section: Between Vadapalanji and Usilampatti stations, at railway Km 19/2-3.
  • arrow_right_altGirder: Bow-string steel girder, 2 spans of 51.40 m each.
  • arrow_right_altContract mode: EPC, under the Sethubharatham project.
Main Span
2 × 51.40 m
Bow-string steel girder
Replaces
LC 17
Level crossing
Completed
Mar 2026
Opened to traffic
Standards RegisterRev 2026
verified

In-House Quality Control

Materials are tested at our own quality control laboratory, with records kept for departmental inspection.

verified

Railway Civil Works Code Compliance

Executed to the applicable Indian Roads Congress, MoRTH or RDSO specification for this class of work, with records available for departmental audit.

Capital Plant Assets

Dedicated Machinery Fleet Mobilised

View full TTK equipment directoryarrow_forward
Asset: RMCActive

Ready-Mix Concrete Plants

8 plants (Schwing Stetter, Ajax) — 7 of CP-30 and 1 M1 plant — supplying concrete straight to site, backed by 35 transit mixers.

Plants
8 Units
Asset: HMPActive

Hot Mix Plants

Two Apollo hot mix plants (ANP 2000 and ANP 1500) producing asphalt for our own road works.

Capacity
140 TPH & 120 TPH
Asset: PAVActive

Pavers

Three pavers (Vögele, Apollo) of 9 m and 7 m paving width, with vibratory and tandem rollers to follow.

Pavers
3 Units
Asset: CRUActive

VSI Crushers

Three crushers (Puzzolona, Metso) of 200 and 300 TPH, producing aggregate for our own sites.

Capacity
200 & 300 TPH
Tender Procurement & Joint Ventures

Executing a similar project?

Engage our estimation cell for technical pre-bid assessments, precast structural solutions and consortium tenders.