arrow_backBACK TO ALL PROJECTS
Status: Completed 2019Contract No. NHAI PIU Nagercoil · NH-7 | Class 1 PWD Audited
Major Bridge

NH-7 · Madurai – Kanyakumari

Narikulam Tank Major Bridge & Road, NH-7

Construction of the balance road and major bridge across Narikulam Tank, from Km 230/700 to Km 231/250 of the Madurai–Kanyakumari section of NH-7, completed in 2019.

Engineering Spec Sheet
payments
Contract Value
₹27.16 Cr
Road and bridge across the tank
event_available
Status
Completed
2019
account_balance
Client
NHAI
PIU Nagercoil
straighten
Length
550 m
Km 230/700 to Km 231/250
Narikulam Tank Bridge
Narikulam Tank Bridge
The completed major bridge on NH-7
Section 03 // Detailed Engineering Dossier

Scope of Work & Structural Compliance

A high-level bridge and road carrying NH-7 across Narikulam Tank, one of TTK’s completed major bridges.

01

Bridge & Road Works

  • arrow_right_altLocation: Km 230/700 to Km 231/250 of the Madurai–Kanyakumari section of NH-7.
  • arrow_right_altWorks: Major bridge across Narikulam Tank, with the balance road.
  • arrow_right_altClient: NHAI, PIU Nagercoil.
Length
550 m
Km 230/700 to Km 231/250
Highway
NH-7
Madurai – Kanyakumari
Completed
2019
Handed over
Standards RegisterRev 2026
verified

In-House Quality Control

Materials are tested at our own quality control laboratory, with records kept for departmental inspection.

verified

Bridges & Flyovers Code Compliance

Executed to the applicable Indian Roads Congress, MoRTH or RDSO specification for this class of work, with records available for departmental audit.

Capital Plant Assets

Dedicated Machinery Fleet Mobilised

View full TTK equipment directoryarrow_forward
Asset: RMCActive

Ready-Mix Concrete Plants

8 plants (Schwing Stetter, Ajax) — 7 of CP-30 and 1 M1 plant — supplying concrete straight to site, backed by 35 transit mixers.

Plants
8 Units
Asset: HMPActive

Hot Mix Plants

Two Apollo hot mix plants (ANP 2000 and ANP 1500) producing asphalt for our own road works.

Capacity
140 TPH & 120 TPH
Asset: PAVActive

Pavers

Three pavers (Vögele, Apollo) of 9 m and 7 m paving width, with vibratory and tandem rollers to follow.

Pavers
3 Units
Asset: CRUActive

VSI Crushers

Three crushers (Puzzolona, Metso) of 200 and 300 TPH, producing aggregate for our own sites.

Capacity
200 & 300 TPH
Tender Procurement & Joint Ventures

Executing a similar project?

Engage our estimation cell for technical pre-bid assessments, precast structural solutions and consortium tenders.