arrow_backBACK TO ALL PROJECTS
Status: Completed & Handed OverContract No. TNHRRD/MDU-840/2021 | Class 1 PWD Audited
Special Infrastructure Initiative

NH-744 Corridor Connector

Madurai Outer Ring Road Viaduct & 4-Lane Elevated Bypass

High-speed 28.4 km grade-separated corridor bypassing core Madurai congestion, including twin viaducts, 3 major vehicular underpasses and automated toll plaza infrastructure.

Engineering Spec Sheet
payments
Contract Value
₹146.50 Cr
Itemized EPC tender, nil escalation
timer
Timeline Performance
-45 Days
22.5 months against 24 months
account_balance
Client Principal
TNHRRD / NABARD
Highways Department, Govt. of Tamil Nadu
verified_user
Safety & QA Audit
0 LTI
2,420,000 field man-hours
NH-744 Main Alignment
NH-744 Main Alignment
Four-lane divided carriageway with precast parapet
1 / 5
Section 03 // Detailed Engineering Dossier

Scope of Work & Structural Compliance

Complete structural accountability adhering to Indian Roads Congress (IRC) codal mandates and MoRTH 5th Revision guidelines.

01

Civil & Highway Alignment Engineering

  • arrow_right_altDeep Earthwork & Subgrade Stabilization: Bulk cut-and-fill across high-plasticity black cotton soils, stabilised with lime-slurry injection to achieve a resilient modulus CBR of 12%.
  • arrow_right_altPavement Composition: Granular sub-base, wet mix macadam, dense bituminous macadam with VG-40 bitumen, topped with a stone matrix asphalt wearing course.
  • arrow_right_altElevated / Grade-Separated Works:Post-tensioned PSC girders precast off-site and transported on hydraulic multi-axle trailers, erected with laser-guided alignment.
  • arrow_right_altDrainage & Hydraulics:Reinforced concrete longitudinal side drains and RCC box culverts designed for one-in-fifty-year flash storm hydrological profiles.
02

Underpass & Interchange Complex

Construction of major vehicular underpasses allowing uninterrupted local traffic flow without grade interruption.

Vertical Clearance
5.50 Meters
Over-dimension clearance
Retaining Walls
RE Wall Fascia
Polymer geogrid reinforced
Slipform Barriers
56.8 Linear KM
M35 concrete slipformed
Standards RegisterRev 2026
verified

Third-Party Independent Testing

Direct oversight and QA verification conducted by the Department of Civil Engineering, National Institute of Technology (NIT) Tiruchirappalli.

verified

Roads & Highways Code Compliance

Executed to the applicable Indian Roads Congress, MoRTH or RDSO specification for this class of work, with records available for departmental audit.

Concrete Compressive Strength Curve (M45 Grade)NABL Accredited
Day 7 — target 31.5 MPa34.8 MPa · 110.4%
Day 14 — target 40.5 MPa43.2 MPa · 106.6%
Day 28 — target 45.0 MPa51.4 MPa · 114.2%
Batch plant tested: 1,840 SamplesStandard deviation: ±1.8 MPa
Capital Plant Assets

Dedicated Machinery Fleet Mobilised

View full TTK equipment directoryarrow_forward
Asset: PAV-09Active

Vögele Super 1800-3

High-compaction tracked asphalt paver with AB 500 TV screed, capable of continuous 8.5 m paving widths with laser sensor grade control.

Paving rate
700 Tonnes / Hour
Asset: ROL-14Active

Hamm 311 Tandem Rollers

11-tonne heavy tandem vibratory compactors with integrated HCM asphalt compaction meters, used to guarantee 98% laboratory density.

Linear load
30.5 kg / cm Front
Asset: CRN-03Active

SANY 150T Crawler Crane

Heavy-duty lattice boom crawler crane mobilised for tandem lifting and millimetre-accurate placement of 72-tonne PSC bridge girders.

Lift capacity
150 Metric Tonnes
Asset: BPL-02Active

Schwing Stetter M1.25

Fully automated on-site concrete batching plant with aggregate moisture sensors, chilled water dispensing and computerised micro-dosing.

Batching rate
60 m³ / Hour
Construction Logistics

Execution Milestones & Phasing Velocity

Chronological phasing of the critical path operations for this contract.

Month 01

Geotechnical Subsurface Inquest & Site Mobilization

64 rotary core drillings across the full alignment. Field QC laboratory, aggregate stockpiles and dual weighbridges established at Ch. 12+000.

Month 06

Subgrade Stabilization & Embankment Completion

780,000 m³ of earthmoving finished. Subgrade passed DCP trials with compaction consistently above 97% MDD.

Month 14

Viaduct Pier Caps & PSC Girder Launching

All 24 elevated spans erected, with coordinated night-time tandem crane manoeuvres over railway crossings.

Month 20

Dual-Layer DBM & Stone Matrix Asphalt Surface

Twin sensor pavers working in echelon to eliminate longitudinal cold joints. Roughness index measured under 1,800 mm/km.

Month 22.5

Early Handover & Departmental Quality Acceptance

45 Days Early

Joint walkover inspection with the TNHRRD Superintending Engineer and commissioning of the automated toll plaza.

format_quoteOfficial Client Endorsement

“TTK Construction demonstrated exemplary execution discipline throughout the Madurai Ring Road Corridor project. Their decision to mobilise their own fleet of high-tonnage sensor pavers and cast bridge girders off-site significantly accelerated the timeline. The contract was handed over 45 days ahead of schedule with zero defect liability notices.”

Er. K. Soundararajan, M.E. (Highways)

Superintending Engineer, Highways Department, Government of Tamil Nadu

verifiedCompletion Certified
Cert No.TNHRRD/MDU/CC-2023/84
Signed & sealedOct 2023
Corridor Geometry

Madurai Ring Road Viaduct Alignment

map

Total corridor length: 28.40 KM

Samayanallur Junction to Kappalur Interchange

VUP Completed
4-Lane Vehicular Underpass (3)
Toll Plaza